6 questions Advanced

ECADEMY test

System optimisation in industrial applications

This course test contains 6 questions and can be retaken at any time.

You must answer all questions correctly to pass the test and complete the course.

Start test

Question 3 of 6 Advanced

3 What do Wash & Clean production facilities consider very important?

Question 4 of 6 Advanced

4 What is the estimated payback time when replacing fixed speed pumps with variable speed

Question 6 of 6 Advanced

6 According to Europump, how much energy can potentially be optimised in better system control and design?

Question 6 of 6 Advanced

Happy with your answers?

Submit your current answers and get the final test result.

Submit

Test results

Congratulations. You have passed the test and completed the System optimisation in industrial applications

Achieved badges:

Continue training Go to MyECADEMY

Sorry. You did not pass the System optimisation in industrial applications test this time

Correct
Q: What is the essential aspect of the ‘new mind-set’?
A: Connecting the temperature sensor directly to the pump
Correct
Q: What does curve compensation do?
A: Ensures a steadier regulation
Correct
Q: What do Wash & Clean production facilities consider very important?
A: That the pumps are compact
Correct
Q: What is the estimated payback time when replacing fixed speed pumps with variable speed
A: Two months
Correct
Q: Which of these is a benefit of operating at the power limit?
A: Utilising all available pressure and power
Correct
Q: According to Europump, how much energy can potentially be optimised in better system control and design?
A: 30%