8 questions Intermediate

ECADEMY test

Wastewater transport

This course test contains 8 questions and can be retaken at any time.

You must answer all questions correctly to pass the test and complete the course.

Start test

Question 8 of 8 Intermediate

Happy with your answers?

Submit your current answers and get the final test result.

Submit

Test results

Congratulations. You have passed the test and completed the Wastewater transport

Achieved badges:

Continue training Go to MyECADEMY

Sorry. You did not pass the Wastewater transport test this time

Correct
01.
Q: What is drainage water?
A: Wastewater without toilet waste or impurities like paper, diapers and textile fibres.
Correct
02.
Q: Why is it important that the distance between the start and stop level is not too long?
A: If the distance is too long it reduces the number of cycles, which may cause sedimentation because the water stays in the pit too long.
Correct
03.
Q: What might be the reason a wastewater pump solution requires a big free passage?
A: The need for high flow and/or a high content of solids.
Correct
04.
Q: What is the purpose of the start level sensor?
A: It activates the pump when the water reaches this level.
Correct
05.
Q: What are the benefits of a pumping station with a separate valve chamber?
A: It allows service and maintenance on the valves to be carried out without human interaction with the pit itself.
Correct
06.
Q: What is the main disadvantage of over-dimensioning a wastewater pit?
A: The wastewater stays in the pit too long, which leads to sedimentation.
Correct
07.
Q: What makes the S-tube® impeller virtually clog-free?
A: The excellent hydraulic efficiency and free passage.
Correct
08.
Q: What is parallel operation?
A: When two or more pumps operate side by side simultaneously.