6 questions Basic

ECADEMY test

6 - Groundbreaking vertical In-line pump (TPE3)

This course test contains 6 questions and can be retaken at any time.

You must answer all questions correctly to pass the test and complete the course.

Start test

Question 3 of 6 Basic

3 The TPE3’s flow limit function eliminates the need for what?

Question 5 of 6 Basic

5 How many external pressure sensors are needed in the pipe system when three TPE3s are installed?

Question 6 of 6 Basic

6 The TPE3 has unique wireless technology that allows a number of pumps installed in parallel to connect directly to each other. How many pumps can be installed in parallel?

Question 6 of 6 Basic

Happy with your answers?

Submit your current answers and get the final test result.

Submit

Test results

Congratulations. You have passed the test and completed the 6 - Groundbreaking vertical In-line pump (TPE3)

Achieved badges:

Continue training Go to MyECADEMY

Sorry. You did not pass the 6 - Groundbreaking vertical In-line pump (TPE3) test this time

Correct
Q: The TPE2 features a limit-exceeded function. What does this do?
A: The limit-exceed function allows to influence pump operation, when for example a given pressure or temperature limit is exceeded.
Correct
Q: The TPE3’s integrated heat energy meter ensures that:
A: Energy consumption in HVAC systems is monitored more efficiently
Correct
Q: The TPE3’s flow limit function eliminates the need for what?
A: Pump throttling valve
Correct
Q: What is possible due to the TPE3’s Delta T control mode?
A: The pump is operated based on the temperature difference between flow and return
Correct
Q: How many external pressure sensors are needed in the pipe system when three TPE3s are installed?
A: 0
Correct
Q: The TPE3 has unique wireless technology that allows a number of pumps installed in parallel to connect directly to each other. How many pumps can be installed in parallel?
A: 4