6 questions Intermediate

ECADEMY test

4 - Wastewater in commercial buildings

This course test contains 6 questions and can be retaken at any time.

You must answer all questions correctly to pass the test and complete the course.

Start test

Question 6 of 6 Intermediate

Happy with your answers?

Submit your current answers and get the final test result.

Submit

Test results

Congratulations. You have passed the test and completed the 4 - Wastewater in commercial buildings

Achieved badges:

Continue training Go to MyECADEMY

Sorry. You did not pass the 4 - Wastewater in commercial buildings test this time

Correct
Q: How can you tell if you need to establish a drainage system as part of your building project?
A: By conducting a thorough pre-investigation of the conditions of the soil, the groundwater conditions, and the drainage situation on neighbouring lots.
Correct
Q: What are the approaches that can reduce hydrostatic pressure on your building?
A: Constructing a robust foundation, anchoring the building to the underground, or installing a drainage system – or all three in some cases
Correct
Q: What does a Grundfos MULTILIFT protect against?
A: Backflow and basement flooding
Correct
Q: Why is a lifting station an optimal solution for basement refurbishments?
A: A lifting station is flexible, easy to service, cost effective, provides protection against flooding and is odour free. It can also be connected to the existing drainage pipe easily.
Correct
Q: Why can it be a challenge to install a pumping pit outside a building when removing grey or black wastewater from below sewage level?
A: A pumping pit installation calls for longer planning and installation time, more excavation time and higher excavation costs, as well as a higher initial investment.
Correct
Q: What makes the Grundfos MULTILIFT easy to install?
A: The system comes pre-assembled with a freely adjustable inlet and many other installer benefits