- Test your knowledge
Question 1 of 6
Intermediate
Does choosing a hydronic system affect the indoor climate?
Question 2 of 6
Intermediate
Can Grundfos products be monitored and controlled via a BMS system?
Question 3 of 6
Intermediate
Why is limited space for HVAC installations an issue for building projects?
Question 4 of 6
Intermediate
Do you know how much energy in a commercial building is consumed by a HVAC system?
Question 5 of 6
Intermediate
A distributed pumping system is self-balancing – what does this mean?
Question 6 of 6
Intermediate
Do building services perform as expected in a typical commercial building project?
Question 6 of 6
Intermediate
Happy with your answers?
Submit your current answers and get the final test result.
Test results
Congratulations. You have passed the test and completed the 84 - Adding value in HVAC applications
Sorry. You did not pass the 84 - Adding value in HVAC applications test this time
Achieved badges:
How would you rate this course?
1: Does choosing a hydronic system affect the indoor climate?
No, you choose a hydronic system to save money on installation and energy
You can find the answer here >
1: Does choosing a hydronic system affect the indoor climate?
Yes, indoor climate is improved, and you get cost savings as well
1: Does choosing a hydronic system affect the indoor climate?
Yes, the improved indoor climate makes it worthwhile paying for an expensive solution
You can find the answer here >
2: Can Grundfos products be monitored and controlled via a BMS system?
No, Grundfos pumps provide load adaptive performance, so no external control is possible
You can find the answer here >
2: Can Grundfos products be monitored and controlled via a BMS system?
Yes, Grundfos pumps still require manual monitoring and control
You can find the answer here >
2: Can Grundfos products be monitored and controlled via a BMS system?
Yes, Grundfos pumps can be monitored and controlled via a BMS system as well as offering load adaptive performance
3: Why is limited space for HVAC installations an issue for building projects?
If too little space is used, you have high operation and service costs; and using too much space reduces the floor area that can be rented out
3: Why is limited space for HVAC installations an issue for building projects?
If the required amount of space is planned for at the design stage, this will not be a problem – as long as it matches the size of the installation
You can find the answer here >
3: Why is limited space for HVAC installations an issue for building projects?
This is an issue that can be resolved by renting out the installation floor area to the service provider
You can find the answer here >
4: Do you know how much energy in a commercial building is consumed by a HVAC system?
On average 10-20%
You can find the answer here >
4: Do you know how much energy in a commercial building is consumed by a HVAC system?
On average 30-40%
4: Do you know how much energy in a commercial building is consumed by a HVAC system?
On average 50-60%
You can find the answer here >
5: A distributed pumping system is self-balancing – what does this mean?
No need to integrate a primary pump into the building’s management system
You can find the answer here >
5: A distributed pumping system is self-balancing – what does this mean?
No time-consuming balancing and commissioning process is required
5: A distributed pumping system is self-balancing – what does this mean?
No need to manually check return and control valves – they adjust automatically
You can find the answer here >
6: Do building services perform as expected in a typical commercial building project?
No, only 2% of new buildings have a performance that matches the design estimate
6: Do building services perform as expected in a typical commercial building project?
Yes, only 2% of buildings do not perform as they were designed to
You can find the answer here >
6: Do building services perform as expected in a typical commercial building project?
No, but this is expected – adjusting and optimising building services after completion is always calculated into costs
You can find the answer here >