4 questions Basic
ECADEMY test
Buildings Information Modeling
This course test contains 4 questions and can be retaken at any time.
You must answer all questions correctly to pass the test and complete the course.
Question 1 of 4 Basic
1
Which of the following cannot be performed using a BIM model?
Question 2 of 4 Basic
2
What does BIM stand for?
Question 3 of 4 Basic
3
A Grundfos BIM asset is characterised by?
Question 4 of 4 Basic
4
What unnecessary data is usually responsible for a bloated BIM asset?
Question 4 of 4 Basic
Happy with your answers?
Submit your current answers and get the final test result.
SubmitTest results
Congratulations. You have passed the test and completed the Buildings Information Modeling
Achieved badges:
Sorry. You did not pass the Buildings Information Modeling test this time
Q: Which of the following cannot be performed using a BIM model?
A: Virtual walkthroughs
Q: Which of the following cannot be performed using a BIM model?
A: Three-dimensional planning
Q: Which of the following cannot be performed using a BIM model?
A: Asset redesign
Q: What does BIM stand for?
A: Buildings Interactive Modelling
Q: What does BIM stand for?
A: Buildings Insight Modelling
Q: What does BIM stand for?
A: Buildings Information Modelling
Q: A Grundfos BIM asset is characterised by?
A: Photo-realistic rendering of the product
Q: A Grundfos BIM asset is characterised by?
A: Low file size and no specification data
Q: A Grundfos BIM asset is characterised by?
A: Minimal file size without sacrificing specification data
Q: What unnecessary data is usually responsible for a bloated BIM asset?
A: Data not relevant at any stage of the project lifecycle
Q: What unnecessary data is usually responsible for a bloated BIM asset?
A: Inclusion of unnecessary visual details
Q: What unnecessary data is usually responsible for a bloated BIM asset?
A: The physical appearance of a product