Question 1 of 8 Advanced

How high is the suction lift of the self-priming CM pump?

Question 4 of 8 Advanced

What is the ratio between the capital investment and running costs of a temperature control system?

Question 5 of 8 Advanced

What is the expected payback time of an investment in system optimisation?

Question 6 of 8 Advanced

How do you prevent pumps from malfunctioning when transporting hot water with a temperature of well above 120C°?

Question 7 of 8 Advanced

Which of the following isn’t one of the main benefits of the CM pump range?

Question 8 of 8 Advanced

Happy with your answers?

Submit your current answers and get the final test result.

Submit

Test results

Congratulations. You have passed the test and completed the 29 - Introduction to temperature control

Achieved badges:

How would you rate this course?

You are welcome to add your rating of this course. Remember that you have to be logged in before you take the test to be able to give your rating.

Continue training Go to MyECADEMY

Sorry. You did not pass the 29 - Introduction to temperature control test this time

How would you rate this course?

You are welcome to add your rating of this course. Remember that you have to be logged in before you take the test to be able to give your rating.

Correct
Q: How high is the suction lift of the self-priming CM pump?
A: Up to 8 metres
Correct
Q: How have temperature control systems traditionally been regulated?
A: Constant speed pumps and throttling valves regulating the amount of water entering the heat exchanger.
Correct
Q: Why is ammonia an efficient coolant?
A: Ammonia is able to absorb large amount of heat when it evaporates.
Correct
Q: What is the ratio between the capital investment and running costs of a temperature control system?
A: 1:20
Correct
Q: What is the expected payback time of an investment in system optimisation?
A: 1-5 years
Correct
Q: How do you prevent pumps from malfunctioning when transporting hot water with a temperature of well above 120C°?
A: Equip the pump with double-shaft seals or air-cooled top.
Correct
Q: Which of the following isn’t one of the main benefits of the CM pump range?
A: External control
Correct
Q: Why does a cooling system that uses propylene glycol as coolant demand pumps with oversized motors?
A: The viscosity and density of propylene glycol is higher than tap water.