8 questions Intermediate

ECADEMY test

Wastewater transport

This course test contains 8 questions and can be retaken at any time.

You must answer all questions correctly to pass the test and complete the course.

Start test

Question 8 of 8 Intermediate

Happy with your answers?

Submit your current answers and get the final test result.

Submit

Test results

Congratulations. You have passed the test and completed the Wastewater transport

Achieved badges:

Continue training Go to MyECADEMY

Sorry. You did not pass the Wastewater transport test this time

Correct
01.
Q: What might be the reason a wastewater pump solution requires a big free passage?
A: The need for high flow and/or a high content of solids.
Correct
02.
Q: Why is it important that the distance between the start and stop level is not too long?
A: If the distance is too long it reduces the number of cycles, which may cause sedimentation because the water stays in the pit too long.
Correct
03.
Q: What is parallel operation?
A: When two or more pumps operate side by side simultaneously.
Correct
04.
Q: How far below ground should the manifold – or the discharge pipe – be installed?
A: It depends on local regulation but typically 1 meter down.
Correct
05.
Q: What is the purpose of the start level sensor?
A: It activates the pump when the water reaches this level.
Correct
06.
Q: Can a sewage pump handle all types of wastewater?
A: Yes if the pH value is within 4 – 9 and max. dry content 3 to 5%.
Correct
07.
Q: What is drainage water?
A: Wastewater without toilet waste or impurities like paper, diapers and textile fibres.
Correct
08.
Q: What are the main virtues of the S-tube® impeller?
A: It offers both excellent efficiency and large free passage.