Question 1 of 6
Basic
What is the max. diameter of a PS.G. station?
Question 2 of 6
Basic
How many alternative ways are there to refurbish an old concrete pumping station with a prefabricated solution?
Question 3 of 6
Basic
What does it mean that the CUE frequency converter is pre-programmed?
Question 4 of 6
Basic
How are inlet pipes added to the PS.R stations?
Question 5 of 6
Basic
Up to how many pumps can Grundfos Dedicated Controls control?
Question 6 of 6
Basic
Where is the submerged to dry installation placed?
Question 6 of 6
Basic
Happy with your answers?
Submit your current answers and get the final test result.
Test results
Congratulations. You have passed the test and completed the 19 - Prefabricated Pumping Stations
Sorry. You did not pass the 19 - Prefabricated Pumping Stations test this time
Achieved badges:
How would you rate this course?
1: What is the max. diameter of a PS.G. station?
1: What is the max. diameter of a PS.G. station?
3000mm
1: What is the max. diameter of a PS.G. station?
2: How many alternative ways are there to refurbish an old concrete pumping station with a prefabricated solution?
2: How many alternative ways are there to refurbish an old concrete pumping station with a prefabricated solution?
3
2: How many alternative ways are there to refurbish an old concrete pumping station with a prefabricated solution?
3: What does it mean that the CUE frequency converter is pre-programmed?
It lets you reduce the pumps’ downtime
You can find the answer here >
3: What does it mean that the CUE frequency converter is pre-programmed?
It lets you protect the motor
You can find the answer here >
3: What does it mean that the CUE frequency converter is pre-programmed?
It lets you reduce commissioning time significantly
4: How are inlet pipes added to the PS.R stations?
In-laminated from factory
You can find the answer here >
4: How are inlet pipes added to the PS.R stations?
Added on site with a holedril
4: How are inlet pipes added to the PS.R stations?
In-laminated on site
You can find the answer here >
5: Up to how many pumps can Grundfos Dedicated Controls control?
5: Up to how many pumps can Grundfos Dedicated Controls control?
5: Up to how many pumps can Grundfos Dedicated Controls control?
6
6: Where is the submerged to dry installation placed?
In the top of the old pumping station
You can find the answer here >
6: Where is the submerged to dry installation placed?
It replaces the old pumping station
You can find the answer here >
6: Where is the submerged to dry installation placed?
In a separate hole next to the old pumping station