The Situation
An esteemed Emirati real estate developer, renowned for its extensive portfolio of large-scale projects, sought a wastewater lifting solution for its meticulously designed seaside luxury resort that spans over 6.5 million square meters. This resort is a leading destination on Egypt's North Coast, distinguished by its commitment to delivering unparalleled indulgence.
During the design phase, the resort faced a major hurdle in managing wastewater from five buildings situated below the sewer gravity line. The initial plan for a traditional concrete lifting station deemed impractical due to the Iimited space and time constraints for the project.
The Solution
Grundfos introduced its innovative prefabricated pumping station which transformed the customer experience. With its compact design, it was the best fit for the available space, ensuring a quick and hassle-free installation and commissioning process.
The entire system, including pumps, accessories, and a control panel, was delivered as a plug-and-pump solution. Customers simply positioned the pump station, connected the inlet and outlet pipes, and hooked up the electrical power source. The station was then ready for immediate operation, streamlining the entire process, hence reducing the turnaround time and delivering optimal results.
Grundfos prefabricated solution is a game change for wastewater transport as it significantly reduces the installation time