Question 2 of 4 Basic

2 It’s estimated that BIM can encourage time, cost and energy savings of?

Question 3 of 4 Basic

3 Which of the following cannot be performed using a BIM model?

Question 4 of 4 Basic

Happy with your answers?

Submit your current answers and get the final test result.

Submit

Test results

Congratulations. You have passed the test and completed the 9 - Buildings Information Modeling

Achieved badges:

Continue training Go to MyECADEMY

Sorry. You did not pass the 9 - Buildings Information Modeling test this time

Correct
Q: How does an oversized BIM project negatively affect workflow?
A: The amount of processing required can slow systems down
Correct
Q: It’s estimated that BIM can encourage time, cost and energy savings of?
A: Between 20% and 30%
Correct
Q: Which of the following cannot be performed using a BIM model?
A: Asset redesign
Correct
Q: What unnecessary data is usually responsible for a bloated BIM asset?
A: The physical appearance of a product