contenttype.engineering-manual

Get the Wastewater Engineering Manual 2 – for large pumping stations

If you work with wastewater pumping stations and discharge systems using wastewater pumps up to 520 kW, this manual offers guidance for submersible and dry-pit submersible installation and operation. The manual discusses pump sump design, the proper anchoring of pipe systems, and factors such as sound, noise, air entrainment, vorticity and vibration, together with our recommendations.

For smaller systems, please see the ‘Wastewater Engineering Manual 1’ (pumps with motors from 0.15 kW to 30 kW).

Download the manual now

Our engineering manual will help you understand the most critical aspects of your project. Fill out the form below and we will send you an email providing immediate access. 

There has been an error. Please try again.

Please fill in the required fields

AC_language
Selection

You may withdraw your above consent anytime. For more information regarding your personal data and your rights, please see our Privacy Policy.

Thank you for requesting insights

You will receive the link in your mailbox shortly.

We hope you find it inspiring and useful.

Sewage and stormwater applications

In addition to traditional wastewater discharge systems, sewage and stormwater applications are dealt with separately to ensure the right pump selection and installation.

Correct pump sump design

For pump sump design, we discuss how correct layout with benches in the wet pits and requirements for concrete foundations in dry-pit installations optimise operations.

Other related articles and insights

Find related articles with research and insights from Grundfos.

Related applications

Find applications from Grundfos related to this subject.