Question 1 of 6 Advanced

1 How much can be saved by using a system with direct temperature control?

Question 2 of 6 Advanced

2 What is the estimated payback time when replacing fixed speed pumps with variable speed

Question 3 of 6 Advanced

3 According to Europump, how much energy can potentially be optimised in better system control and design?

Question 5 of 6 Advanced

5 How often does a feed valve require maintenance in a typical boiler system?

Question 6 of 6 Advanced

6 What can you increase the speed to when applying a Grundfos CRE3 pump?

Question 6 of 6 Advanced

Happy with your answers?

Submit your current answers and get the final test result.

Submit

Test results

Congratulations. You have passed the test and completed the System optimisation in industrial applications

Achieved badges:

Continue training Go to MyECADEMY

Sorry. You did not pass the System optimisation in industrial applications test this time

Correct
01.
Q: How much can be saved by using a system with direct temperature control?
A: Up to 70%
Correct
02.
Q: What is the estimated payback time when replacing fixed speed pumps with variable speed
A: Two months
Correct
03.
Q: According to Europump, how much energy can potentially be optimised in better system control and design?
A: 30%
Correct
04.
Q: Which of these is a benefit of operating at the power limit?
A: Utilising all available pressure and power
Correct
05.
Q: How often does a feed valve require maintenance in a typical boiler system?
A: At least once every 12 months
Correct
06.
Q: What can you increase the speed to when applying a Grundfos CRE3 pump?
A: 5800 RPM