6 questions Intermediate

ECADEMY test

84 - Adding value in HVAC applications

This course test contains 6 questions and can be retaken at any time.

You must answer all questions correctly to pass the test and complete the course.

Start test

Question 1 of 6 Intermediate

What component does a Grundfos distributed pumping solution make redundant?

Question 6 of 6 Intermediate

Happy with your answers?

Submit your current answers and get the final test result.

Submit

Test results

Congratulations. You have passed the test and completed the 84 - Adding value in HVAC applications

Achieved badges:

How would you rate this course?

You are welcome to add your rating of this course. Remember that you have to be logged in before you take the test to be able to give your rating.

Continue training Go to MyECADEMY

Sorry. You did not pass the 84 - Adding value in HVAC applications test this time

How would you rate this course?

You are welcome to add your rating of this course. Remember that you have to be logged in before you take the test to be able to give your rating.

Correct
Q: What component does a Grundfos distributed pumping solution make redundant?
A: Balancing and control valves
Correct
Q: Does choosing a hydronic system affect the indoor climate?
A: Yes, indoor climate is improved, and you get cost savings as well
Correct
Q: Do Grundfos Modular HVAC systems reduce the HVAC system footprint?
A: Yes, benefits come from ensuring maximum profitability of rentable square meters as well as reducing complexity and time spent on selecting and sizing
Correct
Q: Why is limited space for HVAC installations an issue for building projects?
A: If too little space is used, you have high operation and service costs; and using too much space reduces the floor area that can be rented out
Correct
Q: Why is installing a Grundfos MIXIT mixing loop solution a good idea?
A: You reduce complexity and time spent on selecting and sizing and MIXIT is up to 25% more cost effective than other solutions
Correct
Q: Do building services perform as expected in a typical commercial building project?
A: No, only 2% of new buildings have a performance that matches the design estimate