6 questions Advanced

ECADEMY test

30 - System optimisation in industrial applications

This course test contains 6 questions and can be retaken at any time.

You must answer all questions correctly to pass the test and complete the course.

Start test

Question 1 of 6 Advanced

According to Europump, how much energy can potentially be optimised in better system control and design?

Question 2 of 6 Advanced

How often does a feed valve require maintenance in a typical boiler system?

Question 5 of 6 Advanced

What do Wash & Clean production facilities consider very important?

Question 6 of 6 Advanced

What is the estimated payback time when replacing fixed speed pumps with variable speed

Question 6 of 6 Advanced

Happy with your answers?

Submit your current answers and get the final test result.

Submit

Test results

Congratulations. You have passed the test and completed the 30 - System optimisation in industrial applications

Achieved badges:

Continue training Go to MyECADEMY

Sorry. You did not pass the 30 - System optimisation in industrial applications test this time

Correct
Q: According to Europump, how much energy can potentially be optimised in better system control and design?
A: 30%
Correct
Q: How often does a feed valve require maintenance in a typical boiler system?
A: At least once every 12 months
Correct
Q: Which of these is a benefit of operating at the power limit?
A: Utilising all available pressure and power
Correct
Q: What does curve compensation do?
A: Ensures a steadier regulation
Correct
Q: What do Wash & Clean production facilities consider very important?
A: That the pumps are compact
Correct
Q: What is the estimated payback time when replacing fixed speed pumps with variable speed
A: Two months