Quick answer: To replace a lifting station or macerator, identify the old unit, match the wastewater type and connected appliances to the right SOLOLIFT2 model, then check dimensions, pipework and service access before removal.

Need the right replacement now? Download the SOLOLIFT2 Replacement Guide to compare existing units, confirm fit and choose the right model faster.

A practical replacement guide for installers

Need to replace an old lifting station or macerator? Start by identifying the existing unit, then match the wastewater type and connected appliances to the right SOLOLIFT2 model. Next, check dimensions, inlet and outlet positions, pipe diameters and service access before removal to help avoid unnecessary changes on site.

With only five SOLOLIFT2 variants covering domestic blackwater and greywater applications, installers can choose faster and specify with more confidence. Flexible connectors supplied with connection parts and a 360° turnable discharge adaptor on selected models help simplify replacement work and reduce the risk of extra pipe adjustments.

Quick selection:
Which SOLOLIFT2 model do you need?

Use the application as your first filter. If the installation includes a toilet, choose a WC model. If it only handles greywater, choose C-3 or D-2 based on the sanitary setup fixture mix, temperature needs and available space.

When should you replace the old lifting station or macerator?

Replace the unit when performance, reliability or serviceability becomes a problem. Common signs include clogging, leakage, foul odours, higher noise levels or repeated service callouts.

For you, these issues can lead to more troubleshooting, more uncertainty and more time on site. A clear replacement process helps reduce that from the start.

Typical replacement situations

  • The old macerator or lifting station is unreliable or difficult to service.

  • The unit is blocked, leaking or causing persistent odour problems.

  • The customer wants a cleaner, more service-friendly replacement solution.

  • The installed product is discontinued or no longer easy to support.

  • A bathroom, basement or utility room renovation creates a replacement opportunity.

Step 1: Identify the old lifting station or macerator

Start by identifying the brand and model of the installed unit. Then use the SOLOLIFT2 Replacement Guide to find the most suitable upgrade and check whether the replacement is expected to fit directly, fit with minor adjustments or require extra installation work.

This helps you choose faster, prepare the right accessories and reduce surprises on site before the old unit is removed.

Installer tip
Before removing the old unit, note:

  • Inlet and outlet positions

  • Pipe diameters

  • Available installation space

  • Connected fixturesappliances (toilet, shower, washbasin etc.) 

  • Access for inspection, maintenance and service

These checks make it easier to confirm the right replacement model and reduce the risk of unexpected changes during installation.

Step 2: Choose the right SOLOLIFT2 replacement model

Use the overview table above as the main model-selection guide, then verify the final choice against product documentation and local installation requirements.

For a quick visual refresher before choosing a model, review the Ecademy module What to look for when replacing a lifting station to reinforce key fit checks and SOLOLIFT2 selection guidance.

Step 3: Check dimensions, connections and fit

Before removal, confirm the replacement can fit the available space and connect to the existing inlet, outlet and discharge pipework.

Focus on the details that most often affect fit: dimensions, pipe routing, connection count and service access.

Check before removal:

  • Available space around the current installation

  • Inlet and outlet positions

  • Number of connected fixtures

  • Pipe diameters and pipe routing

  • Access for inspection, maintenance or service

  • Local plumbing or electrical requirements that may affect the installation

Early checks help keep pipework changes to a minimum.

Step 4: Plan the installation before removal

Plan the job before disconnecting the old unit to protect fit, service access and installation flow.

Check that:

  • The selected model matches the wastewater type and connected fixtures

  • The unit can be positioned correctly in relation to the fixtures

  • There is enough room for maintenance and service access

  • The discharge route supports dependable performance

  • Pipework can be secured to reduce vibration and movement

  • Electrical connection can be completed in line with local requirements

Always check the installation instructions and local requirements before handover.

Step 5: Install, test and commission

After installation, test the system before handover to confirm reliable operation, verify the setup and reduce the risk of a callback.

Run clean water through the connected fixtures and confirm automatic start and stop, leak-free connections and consistent discharge performance. Make sure the unit evacuates as expected and that there is no sign of backflow or poor drainage.

If performance is not as expected, check the power supply first, then review blockage risk, discharge resistance, non-return protection and whether the selected model matches the actual application.

Factbox: Why upgrade to SOLOLIFT2?

SOLOLIFT2 at a glance: Five clearly defined models help installers select, fit, service and replace domestic wastewater units faster and with fewer on-site adjustments.

Easier to select

Five variants make replacement choice simple. 

Easier to install

Flexible connections help reduce pipework changes.

Easier to service

Service-friendly design supports faster, cleaner work.

Easy to trust

Built for dependable domestic wastewater handling.

Easier to replace

Fits many existing installations with minimal changes.

Common replacement mistakes to avoid

Avoid these common mistakes when replacing a lifting station or macerator:

  • Choosing a model that does not match the wastewater type or connected fixtures.

  • Overlooking temperature requirements in greywater applications.

  • Ignoring inlet and outlet positions before removing the old unit.

  • Using poor pipe routing that increases resistance or backflow risk.

  • Placing the unit where future service access becomes difficult.

  • Forgetting to check local plumbing and electrical requirements.

Download the SOLOLIFT2 Replacement Guide

Need to identify the right SOLOLIFT2 replacement before the job starts?

Use the SOLOLIFT2 Replacement Guide to compare existing units, confirm fit criteria and select the most suitable replacement with greater confidence.

Frequently asked questions about replacing a lifting station or macerator